Chat with us on WhatsApp
Infrastructure Development
By: Dattaraj Builtron 2013-2014

Infrastructure Development at TATA Memorial Center, Kharghar (Sub-Contract)

blog image

The TATA Memorial Center, Kharghar, a premier medical and research facility, is undergoing significant infrastructure development under a sub-contract project aimed at enhancing its operational efficiency and structural capacity. This project includes comprehensive civil, structural, and finishing works, ensuring the facility meets the highest standards of durability, safety, and functionality.

The work scope involves earthwork, foundation strengthening, structural steel fabrication, and reinforced concrete construction, providing a stable and long-lasting base for the center’s expansion. High-quality roadworks and drainage systems are being developed to improve accessibility and manage stormwater efficiently, preventing waterlogging and ensuring seamless movement within the facility.

Advanced precast boundary walls are being installed for enhanced security and faster construction, while specialized pile foundation systems are integrated for sections requiring deep structural support. Additionally, meticulous attention is given to interior and exterior finishing, incorporating energy-efficient solutions, fire safety systems, and modern utility installations to support the center’s critical medical operations.

This sub-contract project plays a vital role in supporting TATA Memorial Center’s mission, providing a well-structured, resilient, and future-ready healthcare facility that will serve patients and researchers for years to come.